16 August 2017

Minutes   of   the   ISOLDE   Physics   Group   Meeting,   August   16th   2017   

The   meeting   took   place   in   the   Visitors’   Room   in   B.508.   There  were  no  comments  to the minutes of the last ISOLDE PGM.   

Technical   news   

GPS   /   REX   /   HIE‐ISOLDE   
- Since Tuesday 8th of August, ISOLDE is providing ample beams of 140Sm34+ from GPS to Miniball   (HIE­‐ISOLDE).   
- On midnight of Tuesday all super conducting cavities in cryo-­‐module 1 (XLL2) tripped. The LHe   level   was   found   to   be   at   12%.   Luckily   it   was   slowly   recovering   (10%   in   1   hour).   
Investigations   by   cryo   and   RF   experts   the   report   was   that   SRF05   of   XLL2   was   running   in   field emission   regime   and   slightly   increased   the   power   dissipation   of   XLL2   by   <10%.      

  •  This might have been a small increase but the main LHe valve was set to open up until   a   conservative   value   of   33%.   
  •  It caused the LHe levels to drop which caused the interlock of the amplifiers of XLL2 to   kick   in.   
  •  Actions taken after the incident: Cryo experts increased the threshold to 36%. RF experts   restarted   the   amplifiers.   BE-­OP   needed   to   reduce   the   gradient   of   SRF05   and  rephase   the   remaining   3   cavities.   We   were   using   all   5   cavities   of   XLL2   and   the   first  three   of   XLH1.   Beam   was   given   to   the   users   at   noon   of   Wednesday.   

- 7GAP3 amplifier tripped 4 times in total. SRF02 and 04 both tripped twice. Several CA0 power   supplies   tripped   twice.   
- Target and line heating tripped but users were quick to restart them. 
- On Thursday, protons stopped for an intervention on the PSB. 
- On Sunday a 3h stop due to issues with LINAC 2. 
- First Faraday cup after REX (just before HIE-­ISOLDE) is not working. Perhaps a damaged cable?   This   is   a   difficult   intervention   (REX   needs   to   be   turned   off),   but   is   a   useful   cup   for  setting   the   beam.   It   is   suggested   that   an   intervention   is   performed   in   parallel   with   the   stripping   foil   in   the   next   week.   
- FC490 is giving unreliable feedback, reading double the current. As there is no noise oscillation   on   the   current,   it   is   suggested   that   the   readout   electronics   could   be   the   problem.   

HRS   
- On Friday during the target change, the extraction electrode was inserted all the way in by itself   and   got   stuck   there.   This   is   a   recurring   incident.   The   latest   version   of   the   FESA   class   is   the   suspected   culprit,   and   a   new   version   is   in   the   works.   This   may   be   rolled   out   in   the   next   2   months,   which   could   impact   several   things   at   ISOLDE.   
- Setup for ISOLTRAP 
- HV tripped a few times overnight (at 50kV). Conditioning should help. 

Physics   and   schedule   
- The HIE-ISOLDE run IS558: the experiment can be considered a full success. It resulted in one of   the   biggest   Coulomb   excitation   data   sets   recorded   at   ISOLDE.   With   a   very   high   level   of   statistics,   it   can   be   expected   to   extract   transition   probabilities   and   quadrupole   moments with   high   accuracy.   The   ground-­‐state   band   was   populated   up   to   the   8+   state,   in   addition   to   several   non-­‐yrast   states.   There   is   also   indication   for   the   population   and   identification   of   
previously   unknown   states.   
- ISOLTRAP studying Kr98 (40 ms half life). Calibrating the target to get better signal to background   contamination   ratio   (stable   Mo   and   2+   Hg).   Will   first   check   long-­‐lived   Kr   to   see   what   to   expect.   Initial   checks   suggested   higher   contamination   than   last   run.   
- Solid State Physics with cadmium: implantations in solid, liquid and gas phase this run. Liquid: Biophysics   of   cancer   treatment   –   implantation   of   Cd   isotopes   into   ice   and   mix   with   chelator.   Solid:   PAC   meausurements   of   hydrogenated   titanium   dioxide   samples,   which   should   be   complementary   to   Mossbauer   measurements   earlier   this   year.   This   will   also   serve   as   input   for   a   new   proposal   to   the   INTC.   (Gas)   PAC   with   Cd   halides   –   radioactive   molecule   in   a   gas   phase.          
Safety   
- Rehearsals for collections went well – passed examination   

Visits   
- Visit of 44 visitors of the CERN Teachers Programme at 09:30 Thursday 17th August. Coordination   with   the   SSP   collection   programme   is   necessary.   
  
AOB   
- Hanne requests pictures of the ISOLDE setups to help create an ‘ISOLDE mosaic’ to put on the   cover   of   the   ISOLDE   portrait.   The   deadline   is   the   end   of   the   month.      
- ISOLDE Ge detector – needs to be sent back to Canberra for repair. 

Seminar   
- The meeting was followed by a seminar by Sebastian George from MPIK Heidelberg with the title   “The   Cryogenic   Storage   Ring   Project”.     

The   next   PGM   will   take   place   on   Wednesday,   August   23rd   at   14:00   in   the   Visitors   Room   in   B.508.   It   will   be   followed   by   the   summer   student   talks   of   Ole   Krarup   and   Kristoffer   Bested   Nielsen,   as   well   as   the   seminar   of   Xiaofei   Yang,   with   the   title   “Introduction   to   BISOL”.    

Minutes   taken   by   KML   