ISOLDE Physics Group Meeting 03/05/2017
Technical news
• HRS
- Vito (35Ar) were the main users (IS601) with 1 shift for IDS taking (17N) for
calibrations.
- There was a mix up when switching beam settings between IDS and VITO,
which lead to lost time at VITO.
- No changes had been made to target parameters when switching (as
agreed; may need to re-use this target for VITO later this year).
- However, overlapping arrays meant parameters were
overwritten/changed.
- In addition the RFQ settings could not be recovered due to a new software
limit, which had been installed earlier that day
- This has since been removed, but was implemented to prevent overheating
of the amplifier.
- Tim/Stuart are making a manual to prescribe the future operation.
• GPS
- Proton scan took 6.5 hours due to badly setup separator; the beam was
poorly set up on the horizontal plane.
- It was noticed that an element had drifted.
- Fixed/noticed at 5pm and p+ scan completed, but no yield measurements
were possible due to this delay.
- Independent HV trips on both the target and the line. No reason found e.g.
no vacuum spike, but this has been seen many times before.
- Drift in magnet field/voltages reported by IDS. Tuning appeared to not be
optimum and transmission drifted to 10%; recovered to 65%.
- The cause could not be identified, but Timber will be used to look at the
data. Data from scanners etc. not possible yet. Elefteris is coding this into
the system.
• REX/HIE
- Bake out of REX is finished.
- Cooling of cryomodules has been improved, which will lead to fewer trips
during operation.
• RILIS
- Indium setup continuing for upcoming runs at IDS and CRIS.
• Targets
- #595 worked well last week.
- #597 being installed now.
- MEDICIS monotrack system was used, meaning that the time to change the
target was reduced from 2 hours to only 30 minutes, and no access was
required in the zone.
Physics news
• VITO
- β-asymmetry studies with 35Ar.
- Motivation is fundamental physics and the Vud matrix element.
- Preliminary studies searching for appropriate crystal that can operate at
high temperatures, whilst maintaining the polarization for a long time.
Relaxation time vs. nuclear lifetime.
- Avoid low temperatures (<100K) as much as possible to prevent freezing
dirt onto the surface of the crystal.
- Total of 5 candidate crystals, 2 measured in this beam time.
- 1st crystal showed some asymmetry at low temperatures (~10K).
- 2nd crystal (NaF) maintained reasonable asymmetry at room temperature.
Magnitude is 10x more than 1st crystal, but still not huge.
- Polarisation of lasers should also be checked.
• IDS
- 133Sn being studied in β-decay of 133In. Also had 134In β-n decay.
- Motivation is the single-particle structure with one neutron outside of the
doubly-magic 132Sn core.
- Chances to use RILIS lasers to make isomer selection, enhancing
population of low-spin or high-spin states in the daughter nucleus.
- Neutron ToF spectra obtained and states have been identified.
- Goal to make coincidences between neutrons and gammas; analysis is
ongoing.
- A lot of contamination on these masses for Cs: 20 kBq at mass A=133 and
65 kBq at mass A=134 (in only 8 hours). T1/2 = 10 yrs and 2 hrs,
respectively. IDS passed on this advice to CRIS for the following run, which
will explore a similar region.
• CRIS
- Laser spectroscopy of n-rich In isotopes.
- Motivation is again in the proximity to 132Sn and shell-closures.
- Everything beyond 128In will be new for laser spectroscopy.
- Aim to measure charge radii and moments via high-resolution hyperfine
spectra.
A.O.B.
• European Researcher Night
- ISOLDE would like to be involved, or at least CERN would like ISOLDE to be
involved, this year. It’s in September.
- Interest from French speakers would be good as much of the audience will
be the local community in the Meyrin region.
- If interested, contact Karl to discuss as the promotional material is
expected to be printed and advertised a long time in advance.
• Safety courses
- Nobody signed up for safety courses on 16th May yet. Please inform Karl or
it will be cancelled.
• Operations team
- New operator from PS who will take over piquet duties from Pascal. His
name is Simone and he is training and gathering experience.
• Setups
- WITCH will start up in the week of June 12th. The magnet will be ramped
up for a couple of days or nights and should be communicated with
accelerator people.
- A new policy of oil-free pumps in the HIE-ISOLDE extension is to be
adopted after contamination at Miniball last year.
- Dirty exhaust lines will be replaced before the campaign.
• INTC
- LOIs for stable and long-lived beams are requested at the next INTC
meeting in June.
Minutes taken by LPG